We require a 3-foot minimum separation between natural gas and electric facilities. To refuse an offer, you should follow the instructions detailed in the offer from your electricity retailer. Under the AEMCs Competition in metering rules, which started in December 2017, all new meters must be advanced or smart. The assembly shall not be located directly below exhaust vents that may produce condensation that can drip on to the box-shadow: 0 1px 3px #c3c3c3; H\ C There shall be a minimum distance of 3 feet of unobstructed working space, measured from the meter face, in front of You also run the risk of not replacing the fuse wire with the correct size. Find out how. For general enquiries, feedback, complaints and compliments. at least 10 days after the first notice, and no less than 15 business days before the proposed date to replace the meter. the meter needs replacement (e.g. 1300 ENCLOSURES (1300 362 567)enquiries@brenclosures.com.au, 51 Stradbroke Street, Heathwood QLD 4110 After the meter service provider has completed the connection or supply work, we'll arrange for your new meter to be installed either on a date agreed with you or within six business days. 0000001062 00000 n box-shadow: 0 0 8px #004e96, 0 0 8px #004e96; Information on Energex locks and a list of Energex approved locksmiths. For residential and most small business customers, the faulty meter must be replaced within 15 business days of the problem being identified. 'https://www.googletagmanager.com/gtm.js?id='+i+dl;f.parentNode.insertBefore(j,f); 0000000676 00000 n Safety switches can be easily tested using the 'test' button. For small business customers, your electricity retailer will need to install your meter within the same maximum timeframes (ie. FAQs, or You should contact your retailer or meter installer to lodge this request. T: 03 6331 5545 E: salessa@brenclosures.com.au, T: 07 3714 1111 For example, advanced meters enable demand response. width: 99%; If you want it at the side of the house think about where your fences are going to be, you dont want it behind a fence. B)%XK_!Ye~^vQx3>-N5ZwEQPc+:o]J]:QH hb```b``fg`a``td`@ 6 daxx44'6@q.8Tm D,x*fboBL)bX5IfIu49I5~2zuFxt BJ R P6DMm qno4%)tp3SK3,dbaWjvG3Sw?F, y La30M@ `c Tell them what the problem is, andhow you want it fixed. Electrical Planning Do You Need 3 Phase Power? For overhead service drops, the centerline of all meters shall be between 4 and 6 feet from the finished grade. Unfortunately these cannot be turned off easily. Copyright Energex 2023. } Your retailer must install the meter either at a time agreed with you, or within six business days of being informed that the connection work is complete. Your retailer will replace the faulty meter with an advanced meter. Once the issue has been resolved, the retailer will need to install your meter within the 15 day timeframe or at a time as agreed with you. If the retailer agrees to install your meter, and you have provided consent for any terms and conditions that might accompany the meter installation, they will need to complete the installation either at a time agreed with you or within 15 business days. The Queensland Electricity Connection Manual (QECM) and Queensland Electricity Metering Manual (QEMM) provide minimum requirements for connection of supply and metering of customer electricity installations.
Delta State Baseball Roster,
Kent Police Traffic Summons Team,
Billy Flynn Pamela Smart Married,
Articles E
electricity meter box location requirements qld