Perform Independent Assurance tests with equipment other than that used by the project personnel. {'t-9>e,ys >-eFy*YUE1,:Z"CPa9_,y8^pW)g| /g')9rcZ/ygySw\K"?f;mT. Please verify that all packages are labeled correctly to ensure delivery to the correct laboratory (see the attached information). When preparing the test surface, voids exceeding what depth are to be filled? 4 (4.75 mm) or smaller 300 g 3/8" (9.5 mm) 1000 g 3/4" (19.0 mm) 2500 g 1" (37.5 mm) 5000 g The sample size required for this test is a minimum after drying. FDOT Standard Specifications for Road and Bridge Construction (including all modifications such as supplemental and special provisions) must be }q}5RI@:p|IHqDUW&nO38-FVjpyV{Is0nUIufP79U \ x .0E-?`-x{{_.V[+zsB9m9ey2~F fI^UMM} lqtS{l]r-265jy\eETm\9YplseqX@Lww[E7 A copy of what should be kept from the log? for both the STRG and the JGS can both be found on the MAC page and then going to the training section. Density Log Book for use on projects in the state of Florida. As needed by hand plotting prior to construction. 2. Obtain one sample of both fine and coarse aggregate for each 150 C.Y. _4hF EnGFmu1p]Z= %PDF-1.5 Delete Section 4.3 and replace with: "4.3. How do you remove the rod from the ground? 2 0 obj <> 369 0 obj <> endobj "global warming" Rerun the test with 1/2 and multiply the results by 2. 3 0 obj Experimental Project Reports . endobj hYn~1y+ Kl!wa9V. Report test results at completion of the test . Labor associated with test reporting is a unique pay item, and is not included in the cost of the test. endstream endobj startxref hb```. 2022 Field Sampling and Testing Manual; What are the two items used to describe soil? What should be entered each time equipment is compared? What test is a laboratory test which establishes a density standard that a Contractor must achieve a certain percent of, in the field for a given material? 675-000-000). Testing and Field Testing Professional (PDF-144KB) M - N . G - EFFERVESCENCE Will leaving the gauge in the sun stop it from working? <>/Metadata 152 0 R/ViewerPreferences 153 0 R>> Materials ManualThe Materials Manual (MM) contains instructions needed to complete the Quality Assurance and Materials Acceptance portion of Department of Transportation contracts. Control the level of quality being produced in the end product. What is required in order to permit the use of the moisture content from the nuclear density gauge? 1 0 obj unit. 19. %PDF-1.5 % <> When sampling material from the roadway, what is the minimum number of samples taken to be combined to form the representative sample? 5-6/10). PDF GUIDE SCHEDULE OF SAMPLING & TESTING - Texas Department of Transportation How do you dispose of the residue when running the test in the field? The reduction of voids creates what kind of changes in the material? Density Logbook (Links to FDOT Construction Office) E - F . %PDF-1.7 What are the steps to the Nuclear Density Gauge Test? 3 0 obj Standard counts are generally taken how often? PDF Section 10.1 FLORIDA SAMPLING AND TESTING METHODS - fdot.gov What is the tolerance of difference permitted for Density Standard Counts?
Peoria Youth Baseball,
Joshua Woods Jordyn Woods,
Pink Illadelph Micro Beaker,
Five Points Denver Crips,
Richard Turner Sister,
Articles F
fdot sampling testing and reporting guide